Prerequisites
You've created a simplified Excel report template with an LD worksheet (references in column A), saved it in
DataPool\Forms, and generated a report with the project values in column B.
Steps
Unlike the simplified report, the Excel Project Integration lets you view and modify Excel files directly in DigiPara Liftdesigner, and transfer values from Excel back to the Liftdesigner project — and vice versa.
1.) Open the Excel Reporting docking window. The Excel Reporting docking window is only active once the project has been saved..
2.) Get to know the docking window. In the Excel Reporting docking window you can show and edit Excel files, load and save Excel template files, and transfer values to DigiPara Liftdesigner and back. The toolbar contains the list of currently loaded Excel files and the commands Create a new report, Delete report, Rename report, Reload report, and Open in Excel.
3.) Create a new report. Click Create a new report. The prepared DigiPara Liftdesigner Excel file already contains a sheet that is used to read and transfer values correctly. The new Excel report is saved automatically in a path that depends on the location of the project file (.ld3).
Result
An Excel Project Integration report is created for the practice project and saved next to the project file, ready to exchange values with DigiPara Liftdesigner.
Next Step




