Skip to main content

Step 2 of 10: Prepare the DTTab Table

PL8.2: Duty Tables - Operation 1

Written by Alexandra Göttert

This is the master record every other duty table table will reference.

Prerequisites

  • Complete the previous step.

Steps

1.) Add a record for a new DTTab. In DigiPara Liftdesigner Datamanager, open the DTTab table (L_DTTab) and add a record for your new duty table.

Result

The master duty table record exists, with a RID that the next tables in this tutorial will reference.

Next Step

Did this answer your question?