Skip to main content

Step 9 of 16: Use Sloppy Mode and Increase the Number of Floors

EL2.9: Double Deck Workflow - Sloppy Mode and Floors

Written by Alexandra Göttert

Prerequisites

  • The separator beam, hall buttons, and through holes are configured.

Steps

1.) Workflow Step 8 — use Sloppy Mode. Switch on Sloppy Mode (see Step 4 of this tutorial) for faster project processing while scaling up the project.

2.) Workflow Step 9 — increase the number of floors. Add +10 floors at once for faster creation of several floors across all shafts.

Result

The double deck project is scaled up efficiently — Sloppy Mode keeps the project responsive, and floors are added ten at a time across every shaft. This completes the recommended 9-step workflow for large elevator groups.

Next Step

Related Video Tutorial

Did this answer your question?