Skip to main content

Step 13 of 16: Create the Matching Vertical Sections for CWT_R

B2.13: Create and Save New View Frames for the DST

Written by Alexandra Göttert

Rather than rebuilding the pit and head sections from scratch, this step derives the CWT_R versions from the CWT_L views you already built.

Prerequisites

  • Both vertical sections (pit and head) for CWT_L exist and are saved.

Steps

1.) Open the existing CWT_L views on the CWT_R project. Open the two views you created for CWT_L — VerticalSectionPit_CWT_L and VerticalSectionHead_CWT_L — on the CWT_R project as your starting point.

2.) Modify the new vertical sections for CWT_R. Change the orientation of the views by 180 degrees, change the descriptions to "Vertical Section Head CWT_R" and "Vertical Section Pit CWT_R", and adjust the position of the descriptions.

3.) Save your own vertical sections for CWT_R. Save the new view frames inside the existing MyDST-Viewframe folder, as VerticalSectionHead_CWT_R and VerticalSectionPit_CWT_R.

Result

Both vertical sections — pit and head — now exist for the CWT-right project too, built by reorienting and relabeling the CWT-left versions rather than rebuilding them from scratch.

Next Step

Did this answer your question?