A2 - Elevator Fundamentals
Work on application examples with the DigiPara Liftdesigner!
By Alexandra1 author18 articles
- Step 1 of 18: Create the Practice Elevator Project
- Step 2 of 18: Use Main Project Data and Component State
- Step 3 of 18: Exchange Components and Use Product Options and Component Rules
- Step 4 of 18: Configure Rail Bracket Fixing Options and a Concrete Beam
- Step 5 of 18: Add Shaft Door Anchor Rails
- Step 6 of 18: Create and Configure an Entrance Pocket
- Step 7 of 18: Configure Additional Sill Options
- Step 8 of 18: Configure Refuge Spaces and Platforms
- Step 9 of 18: Configure Hall Buttons
- Step 10 of 18: Configure Hall Displays and Wall Finish
- Step 11 of 18: Change the Counterweight Location and Adjust Its Pulley Beam
- Step 12 of 18: Adjust the Car Frame Pulley Beam Settings
- Step 13 of 18: Exchange a Central Guided Car Frame for an L-Shaped Car Frame
- Step 14 of 18: Configure Rope Wall Fixings
- Step 15 of 18: Configure Machine Beams and a Self-Constructed Gear Base
- Step 16 of 18: Configure a Lateral Guided Gear Base Construction
- Step 17 of 18: Configure Rail Bracket Fixing Profiles for Hydraulic Elevators
- Step 18 of 18: Configure Machine Room Basic Settings and Switch from MR to MRL
