Each Revit project has one site and one building in EAO. You set them up when you create the first elevator group. To change them later, use Site and Building on the ribbon.
Prerequisites
You are signed in to EAO in Revit.
Change the site
On the Add-Ins tab, click Site. The window MODIFY SITE opens.
Change what you need:
SITE NAME
SEISMIC ZONE
SITE LOCATION: continent, country and state
MODEL UNIT and DISPLAY UNIT are shown, but greyed out.
Click finish.
Result: The site has the new settings.
Change the building
On the Add-Ins tab, click Building. The window MODIFY BUILDING opens.
Change the BUILDING NAME or BUILDING TYPE, then click next.
In BUILDING FLOORS, select the MAIN FLOOR: the floor with the main entrance. The list shows your Revit levels with FLOOR DESIGNATION, ELEVATION (MM) and the floor-to-floor height.
Click finish.
Result: The building has the new settings.
NOTE: The floors come from the Revit levels marked as Building Story. To add or remove a floor, change the levels in Revit.